MEP Plant
Our client was tasked to design a new electrical transformer and electrical duct line run within the existing as-built conditions. Client requested a geo-referenced 3D PointCloud deliverable to use for design and clash detection for their new design.
POINTCLOUD
POINTCLOUD
POINTCLOUD
POINTCLOUD